Electrical equipment for the grid and for storage
Power transformers, switchgear and integrated battery enclosures, built at three US plants.
Reports and news
Report · October 6, 2026 · PDF, 12 pages
Vale Systems: storage equipment supply outlookLead times, prices and delivery risk for the electrical equipment used in US utility-scale storage projects.
Press release · September 29, 2026
Vale Systems to add a second power transformer line at Carver Point$140 million investment raises annual large power transformer capacity from 60 to 105 units.
Products
Main power transformers up to 300 MVA, pad-mounted step-up transformers, medium-voltage switchgear, protection and control panels, and integrated battery enclosures (DC blocks).
Industries
Electric utilities, transmission developers, battery storage developers and large industrial loads.
About
Vale Systems employs about 2,400 people at three US plants, including its transformer plant at Carver Point. Media: press@valesystems.example